Guides
Before we measure.
What has to be done in the bathroom before the glass can be measured, and what happens when it is not.
Call or text (208) 286-1285 for a ballpark from a photo.
Green tile, arched alcoveGLASS23
Why the measure waits for the tile
Tempered glass cannot be cut, drilled or trimmed after it is made. The panel arrives at the size it was ordered. So the measurement has to be taken from the finished space, not from the plans and not from the framing. A quarter inch of tile and thinset changes the number.
The checklist
Wall tile complete and grouted where the glass will land. Curb or tub deck finished and level. Shower head, valve and any niches in their final positions, because they decide which way the door swings. Floor finished if a panel lands on it. For a steam enclosure, the ceiling inside the shower tiled, flat and level. Paint can wait; glass can go in before the walls are painted.
What we do at the measure
Measure every panel location at top, middle and bottom, check plumb and level, confirm the swing and the hardware positions, hold glass samples against your tile, and go through finish and coating. Then we write the proposal. About an hour.
Timeline from there
Two to three weeks from an approved proposal to install for shower glass. Longer for laminated railing glass. Plan the measure for when the space is ready, and the glass will be in before the rest of the punch list is done.
More guides
Questions we get.
Can you measure off the plans to save time?
We can give a ballpark off the plans. The glass is ordered off the finished room. Ordering off plans is how enclosures end up with gaps.
Does the room need to be painted first?
No. Paint touch-up after the install is normal.
My contractor wants the glass order placed early. What do I tell them?
Tell them to call us. We will give them the rough opening we need and the order date that works back from their finish date.
Recent work.
Send a photo.
Get a number.
Text (208) 286-1285 a photo of the space with a rough width and height, or use the form. We come back with a ballpark, then measure and send a written proposal. We will beat a comparable quote more often than not; send it over and ask.